Construction Litigation
Construction Analysis terms within construction litigation.
construction-litigation
Additional insured status extends a downstream party's liability coverage to upstream parties on a project.
A certificate of occupancy is the municipal approval permitting a building to be legally occupied.
A compensable delay entitles a contractor to both a time extension and recovery of delay costs.
Concurrent delay occurs where two or more delays affect the critical path simultaneously with different responsible parties.
Contractual risk transfer allocates project liability downstream through indemnity, insurance, and waiver provisions.
Critical path method identifies the sequence of activities determining project duration, forming the basis of delay analysis.
The economic loss rule bars tort recovery for purely economic losses arising from construction contract performance.
The Eichleay formula calculates unabsorbed home office overhead during a compensable construction delay.
An excusable delay entitles a contractor to a time extension because the cause was beyond its control.
Construction indemnity provisions shift liability for claims arising from the work down the contracting chain.
Measured mile analysis compares productivity in unimpacted and impacted periods on the same project to quantify inefficiency.
The modified total cost method adjusts the total cost calculation by deducting costs attributable to the contractor.
A no damages for delay clause limits a contractor's remedy for owner-caused delay to a time extension without compensation.
A punch list itemizes remaining minor work and corrections identified at substantial completion.
Schedule analysis reconstructs project timing to establish delay causation and responsibility.
A construction statute of repose bars claims a fixed period after substantial completion regardless of when the defect appears.
Substantial completion is the point at which work is sufficiently complete for the owner to occupy and use the project.
The total cost method calculates damages as the difference between actual costs and the original bid.
A warranty period obligates a contractor to correct defective work discovered within a defined time after completion.
Complex litigation, simplified.
Overview
Review
Draft
Strategy & Settlement
Research
Assistant
By Type
Law Firms
Insurance Carriers
Practice Areas
Tort & Insurance
Mergers & Acquisitions
Business Litigation
Employment Law
Construction
Real Estate
About
Careers
Contact
Articles
Newsroom
Media Kit
LegalTech.FYI
© 2026 Turbo Law, Inc.
Terms
Privacy Policy
Cookie Policy